Who it's for

Any factory with vehicles, weighbridges, production lines — and an ERP that can't see the floor.

RunFactory fits process manufacturers running multiple plants, hundreds of vehicles a day, and an ERP that stops at the transaction. Find your industry, or jump to your role.

01By Industry

Built on edible oil. Ready for the rest.

I/01Proven

Edible Oil & Food Processing

Bulk tankers, weighbridges, refining lines, SAP. Where RunFactory was born.

Same loop: gate → weighbridge → dock → production → billing → SAP.
I/02

Chemicals & Petrochemicals

Hazardous bulk movement, strict compliance, continuous process lines.

Same loop: gate → weighbridge → dock → production → billing → SAP.
I/03

Cement & Building Materials

High truck volume, weighbridge-centric dispatch, dusty gate chaos.

Same loop: gate → weighbridge → dock → production → billing → SAP.
I/04

Steel & Metals

Heavy inbound/outbound, scrap-to-coil weighment, energy-intensive.

Same loop: gate → weighbridge → dock → production → billing → SAP.
I/05

Pharma & FMCG

High SKU count, audit trails, cold-chain and compliance pressure.

Same loop: gate → weighbridge → dock → production → billing → SAP.
I/06

Fertilizers & Agri-Inputs

Seasonal surges, subsidy compliance, bagged + bulk dispatch.

Same loop: gate → weighbridge → dock → production → billing → SAP.
I/07

Auto Components

JIT inbound, dock scheduling, supplier vehicle churn.

Same loop: gate → weighbridge → dock → production → billing → SAP.

If your plant has these four things, RunFactory fits.

2+
factories
50+
vehicles / day
A
weighbridge on site
ERP
SAP / Oracle / Tally
02By Role

Everyone at the table finally gets to say 'I know.'

For Founders / Promoters

I built a ₹2,000Cr company but I genuinely don't know what happened in my Kakinada factory yesterday.

You get
  • Daily Plant Pulse across every plant
  • One source of truth, not a Friday Excel
  • Know before coffee
For VP Operations / COO

Vehicle turnaround is 3 days. It should be 4 hours. I can't pinpoint the bottleneck.

You get
  • Live trip tracking gate-to-gate
  • TAT analytics + predictive warnings
  • Dock and weighbridge queue visibility
For Plant Managers

Production reconciliation takes 2 days. Losses slip through. My dock is managed by shouting.

You get
  • Shift-by-shift production vs meter
  • Live dock grid, no walking
  • Anomaly alerts the moment they happen
For CFO / Finance

We're probably overpaying vendors 5–10% but I can't prove it.

You get
  • Auto-drafted freight bills against rate master
  • Reconciliation that flags every mismatch
  • Billing cycle weeks → days
For IT Heads

I don't want another rigid multi-year system to babysit.

You get
  • ERP-parallel, hardware-aware
  • Bidirectional SAP middleware
  • Self-healing integrations + full audit trail
03Go Deeper

Read the story behind your pain.

Long-form narratives that walk one operator's problem end to end — from the chaos to the fix.

For VP OpsLive

The Dispatch Bottleneck

Why a 4-hour turnaround quietly becomes 3 days — and where the hours actually leak.

Read the narrative →
For FoundersComing soon

The Stale Excel

The Friday report that's already wrong by Monday — and the cost of running blind.

In production →
For CFOComing soon

The Billing Black Box

Where the 5–10% vendor overpay hides, and why it never shows up in the ledger.

In production →

Tell us about your plant. We'll show you the gap.

Start with a 90-day pilot at one factory — fixed scope, fixed fee, measured ROI.